by fireflypt | Dec 9, 2011 | Fishing Vessels, New Work, Uncategorized
Greg is fabricating steel tanks for Muskrat.
by fireflypt | Nov 7, 2011 | Motor Vessels, New Work
Amak is changing dramatically on a a daily basis. My weekly visits are not enough to keep up with the progress happening there. Here Mike is trimming out beautiful sepele window sills and Clinton is building the house sides.
by fireflypt | Oct 20, 2011 | Fishing Vessels, New Work, Uncategorized
The Muskrat arrived to the Shipwright’s Co-op after it was hit by a 100 foot crabber while docked in Kodiak, Alaska. Project Manager, Martin Mills, is working with Greg Laubach and Dean Bozack to determine what needs to be repaired. They have begun by removing...
by fireflypt | Oct 14, 2011 | Motor Vessels, New Work
Maintenance, repairs, bulwarks, planking and caulking are completed and the transformation of this retired tugboat is underway. Clinton removed many structures, using great strength to demolition parts of the boat that have existed for almost a century. There are...
by fireflypt | Oct 10, 2011 | New Work, Sailing Vessels
Matt Mortenson has installed wind power for Destiny. There are two D-400 Energy 72 volt wind generators. The maximum power output rating is 600 plus watts. 235 watts 16.31 amps at 22 knots wind speed. 420 watts 29.16 amps at 28 knots wind speed.