Muskrat

Muskrat

The Muskrat arrived to the Shipwright’s Co-op after it was hit by a 100 foot crabber while docked in Kodiak, Alaska.  Project Manager, Martin Mills, is working with Greg Laubach and Dean Bozack to determine what needs to be repaired.  They have begun by removing...
Solar Panels Installed

Solar Panels Installed

Destiny’s solar array is both stationary and mobile to allow for a total of 12 panels.  Six panels are rack mounted on sliding frames to increase surface area during moored or docked situations.  The panels are 12 215 watt Sanyo HIT-N215A01 mono crystalline...
Spirit Quest

Spirit Quest

Spirit Quest returned to PTSC for a systems overhaul during the spring.  For 5 months Chris Brignoli led a team of shipwrights in the process of removing, rebuilding and installing mechanical, electrical, and plumbing systems.   This immense mechanical job had the...